Fees
Industries monitored under the pretreatment program are subject to surveillance fees and surcharges for excessive and extraordinary strength discharges. These fees shall be reviewed on an annual basis to reflect changes in operating cost.
Industrial Discharge Permit Application
The primary purpose of the Pretreatment Program is to protect the wastewater treatment facility from high strength discharges from industrial users. All industries wishing to discharge into the sanitary sewer system must complete an Application for Industrial Discharge Permit. The permit will be issued by the director with discharge limits for each individual industry. The permit is valid for five years. An application must be completed and submitted along with a $50 processing fee before the permit is granted.
Please submit the completed application to:
Steve Huffman
Pretreatment Coordinator
2032 Blanton Drive
Murfreesboro, TN 37129
Hauled Waste
Hauled septage from septic tanks may be discharged at the Water Resources Recovery Facility on Blanton Drive after receiving a discharge permit.
All haulers are required to possess a valid discharge permit prior to being allowed to discharge. Failure to adhere to the terms of the permit may result in penalties and/or revocation of the permit. All haulers must comply with the special permit conditions.